Generation and imports
Solar output, grid imports, exports and any storage are considered within the metering plan. We assess which data is already accessible.
Electricity from your roof is only the beginning. What matters is when it is generated, who uses it and how those volumes are billed. meterra brings these questions together in a data and billing concept for your solar installation, from on-site use to allocation across a multi-unit building.
Let’s talk about your project
Generation, self-consumption, grid imports and exports are assessed using the available meter data.
The metering and billing model determines how locally generated electricity can be assigned to participating consumers.
Generation and demand need to align in time. Suitable load profiles show when solar power can be used on site and which data is still needed to assess storage or charging points.
We start with your building as it is today. Together, we work out the next steps.
We assess the solar installation, any storage and the consumers to be included in the concept.
We check available readings and agree on responsibilities and how electricity volumes will be assigned.
We define the readings needed for billing and the reports useful to the property team.
What we bring together
Using solar power is about more than annual output. The timing of consumption and the chosen supply model matter.
Solar output, grid imports, exports and any storage are considered within the metering plan. We assess which data is already accessible.
Which units will use solar power, under which model and with which allocation? These questions are checked against metering requirements and responsibilities.
Self-consumption and grid imports answer different questions from total output. Together, we define reporting useful to property teams, operators and investment decisions.
An everyday building scenario
High annual output does not tell you how much electricity is used on site. Aligned generation and consumption data reveal the overlap, providing a basis for assessing storage, charging schedules or changes in use.
Germany’s shared building supply model provides for allocation in quarter-hour intervals. Additional electricity remains covered by separate supply contracts.
Background: Shared building supply under section 42b EnWG ↗We’ll work through the details for your specific project.
Tell us about your properties. We’ll help connect the dots.